| | ITEM | EACH | QTY | SUB-TOTAL | |
| 1 | Rwanda Standards | RS ISO 12917-1: 2002 PETROLEUM AND LIQUID PETROLEUM PRODUCTS — CALIBRATION OF HORIZONTAL CYLINDRICAL TANKS — PART 1: MANUAL METHODS | 69,000.00 | 30 | 2,070,000.00 | |
| 2 | Rwanda Standards | RS ISO 4921: 2000 KNITTING — BASIC CONCEPTS — VOCABULARY | 52,500.00 | 32 | 1,680,000.00 | |
| 3 | Rwanda Standards | RS EAS 128: 2023 MILLED RICE — SPECIFICATION | 10,500.00 | 30 | 315,000.00 | |
| 4 | Rwanda Standards | RS 262: 2019 PRECAST CONCRETE ROAD KERBS, EDGINGS AND CHANNELS — SPECIFICATION | 22,500.00 | 31 | 697,500.00 | |
| 5 | Rwanda Standards | RS ISO 6707-2: 2017 BUILDINGS AND CIVIL ENGINEERING WORKS — VOCABULARY — PART 2: CONTRACT TERMS | 54,000.00 | 37 | 1,998,000.00 | |
| 6 | Rwanda Standards | RS ISO 7507-3: 2006 PETROLEUM AND LIQUID PETROLEUM PRODUCTS — CALIBRATION OF VERTICAL CYLINDRICAL TANKS — PART 3: OPTICAL — TRIANGULATION METHOD | 57,000.00 | 32 | 1,824,000.00 | |
| 7 | Rwanda Standards | RS ISO 6504-1 PAINTS AND VARNISHES — DETERMINATION OF HIDING POWER — PART 1: KUBELKA-MUNK METHOD FOR WHITE AND LIGHT-COLOURED PA | 54,000.00 | 23 | 1,242,000.00 | |
| Total | RWF 9,826,500.00 | |